| post & beam patio |
| Dry Rot and Termite Damage to Exterior Wall Fraing |
| Exposed Damaged Wall Framing |
| Dry Rot and Termite Damage |
| New Wall Framing Being Installed |
| Termite and Dry Rot Damage |
| New Wall Framing |
| New Beams Attached To New Building Wall Framing And Support by New Posts |
| New Beams and Post Anchored to new Post Base |
| New Concrete Footing for Office Area |
| New Footings For Office Area |
| Footings for Office to Include Wall Framing Post & Beams |
| Office side of Building Showing New Mansard Roof Framing |
| East Side of Building Showing New Office Area on Right and Patio Area on Left |
| Front Of Building Showing The Framing |
| West side of Building Showing Framing |
| Roofing Being Installed and Skylights Being Water Tested |
| Mansard Roof Framing Ventalation Being Installed |
| East Side of Building Showing New Stucco, Roofing on the Mansard, Patio area on the Left and Office Wall on Right, to include new Ventelation for Pool Pump Room. |
| This Picture Show's The Front Of the Building |
| This Is The Office Side of the Building |