post & beam patio |
Dry Rot and Termite Damage to Exterior Wall Fraing |
Exposed Damaged Wall Framing |
Dry Rot and Termite Damage |
New Wall Framing Being Installed |
Termite and Dry Rot Damage |
New Wall Framing |
New Beams Attached To New Building Wall Framing And Support by New Posts |
New Beams and Post Anchored to new Post Base |
New Concrete Footing for Office Area |
New Footings For Office Area |
Footings for Office to Include Wall Framing Post & Beams |
Office side of Building Showing New Mansard Roof Framing |
East Side of Building Showing New Office Area on Right and Patio Area on Left |
Front Of Building Showing The Framing |
West side of Building Showing Framing |
Roofing Being Installed and Skylights Being Water Tested |
Mansard Roof Framing Ventalation Being Installed |
East Side of Building Showing New Stucco, Roofing on the Mansard, Patio area on the Left and Office Wall on Right, to include new Ventelation for Pool Pump Room. |
This Picture Show's The Front Of the Building |
This Is The Office Side of the Building |