Friday, September 10, 2010

Bill & Sandy West Master BedRoom & Bathroom Addition in Vista

Footing and Slab ready for concrete
Installing concrete slab
Installing concrete slab
Finishing new concrete slab
Start Framing
More Framing
Preparing to stand rake wall
Framing complete
Installing Plywood Paneling
Installing roof rafters
Roof sheeted and fascia installed

Tuesday, August 31, 2010

Commercial Demolation and Reconstruction for a Pool/Recreation/Office New Building For Vista Park Villas Onwers Association Vista Ca.

The following pictures are of this pool side recreation/bathroom building that deFigarelli construction remodeled, the pictures will start with the original post and beam roof design patio, and finish off with a new mansard four hip designed hot moped roof, to include (2) skylight's in the office ceiling area, new paint and bathroom fixtures. with the new exterior stucco applied.
post & beam patio
Dry Rot and Termite Damage to Exterior Wall Fraing
Exposed Damaged Wall Framing

Dry Rot and Termite Damage
New Wall Framing Being Installed
Termite and Dry Rot Damage
New Wall Framing
New Beams Attached To New Building Wall Framing And Support by New Posts 
New Beams and Post Anchored to new Post Base
New Concrete Footing for Office Area
New Footings For Office Area
Footings for Office to Include Wall Framing Post & Beams
Office side of Building Showing New Mansard Roof Framing
East Side of Building Showing New Office Area on Right and Patio Area on Left
Front Of Building Showing The Framing
West side of Building Showing Framing
Roofing Being Installed and Skylights Being Water Tested
Mansard Roof Framing Ventalation Being Installed
East Side of Building Showing New Stucco, Roofing on the Mansard, Patio area on the Left and Office Wall on Right, to include new Ventelation for Pool Pump Room.
This Picture Show's The Front Of the Building
This Is The Office Side of the Building

Thursday, August 26, 2010

Just finished new sunset view patio with stamped and colored concrete/firering & bbq



The following pictures are of a recent patio project consisting of regrading, to create about 2,300 sq ft of split level ground to install the following, stamped and colored concrete with radius steps, gas built in BBQ, power for electrical outlets and refrigerator, plumbing for a counter top stainless sink, gas feed lave rock filled fire ring, private seating area for two over looking the pool and vista's, guarded by an all tempered glass handrail.

New Second Floor Balcony With Access Door From Master Bedroom


The following pictures are of the start to finish of this second floor master bedroom balcony with a new exit door with side glass ventilation.